William Parker Sixth Form Centre

New Sixth Form Centre, Hastings

Duration on site: 35 weeks

Our first project at William Parker Sports College; Directline Structures designed and built a purpose-built sixth form centre which included new classrooms, sixth form common room, servery, quiet study area, resource centre and IT suite. Since the new centre was opened the sixth form has been over subscribed by students drawn to its appealing design and layout.

The steel frame allowed for flexibility of space and the effective design makes the building appear to be smaller than it actually is. The building is incredibly hard wearing, with durability and ease of repair in mind at all times.

“All sixth forms should be built like this” David Evans, Operations Director