Progress at Caldecott

8th June 2012

The building is really taking shape now, luckily the guys are able to work inside in this very windy weather. The interior has been lined with plasterboard and looks very tidy indeed. Externally, the bricks have arrived and the team is nearly ready to start getting them up to finish off the walls. It is set to be a very smart and quality building.

[slickr-flickr tag = “Caldecott 8th June”]

1st June 2012

The Directline Structures team are powering through the build at Caldecott. The build is progressing well, with the roof and cladding elements finished, and the studwork going in for the brick.

The scheme was saved by Directline Structures’ efficient and sensible design which means the school will soon have use of functional, safe and comfortable buildings.

[slickr-flickr tag = “Caldecott”]